Ambulatory № 1 in Volnovakha
Contracting organisation: VTK LLC
Damages: significant damage to the roof, load-bearing structure and interior premises during hostilities. Since the paramedic and midwifery station provided primary care to citizens during restoration work, the builders repaired the building in the shortest possible time.
Work performed: restoration of load-bearing structures, closing the thermal circuit, erection of a new roof, comprehensive restoration of facades. The builders restored engineering equipment and ventilation systems, replaced windows and doors, carried out interior finishing work, and also carried out landscaping of the territory and arrangement of pedestrian paths and recreation areas.