Multi-apartment residential building in Ilyichevsky district of Mariupol
Year of construction: 1958.
Contracting organization: PSK Stroymonolit LLC
Damages: destruction during combat operations (from dynamic and long-term thermal effects). During the technical examination, violations were identified during the laying of utility lines. Doors and windows were damaged.
Work performed: dismantling and restoration of all damaged structures in accordance with specially developed technical solutions. Major roof repairs. Replacement of doors and windows. All engineering communications have been rebuilt. Comprehensive restoration of facades: repair of damaged areas, plastering, painting, repair of blind areas around the entire perimeter of the building. Decoration of common areas.