Secondary school in Zhovtny district of Mariupol
Area: 5 549 m2
Contract organization: JSC "GC "EKC"
Damages: Shelling destroyed the sports hall, damaged the roof and knocked out all translucent structures.
Works performed: repair and restoration works were organized from September 2022 to February 2023 without stopping the educational process in parallel with conducting training sessions in 3 shifts, around the clock, seven days a week. The builders completely replaced the facade, restored the roof, installed internal engineering systems, security and fire alarms. The interior decoration of all premises was completed using original color solutions, all windows and stained-glass structures were replaced, catering equipment was installed in the dining room, as well as modern ventilation equipment. Works on improvement of sports grounds, as well as a large, modern football field for holding sports events were carried out.